The ol’ fixer-upper

If you’ve driven past the Liberty Memorial Bridge lately I’m sure you’ve seen these scaffolds stuck to the side of two of the support columns. Work continues to put a steel liner around the two trouble spots and fill the gaps with a special concrete.

It looks like one of them is completed and the other one under wraps in these photos, which I took this weekend. I bet it’s cold working up there…that’s likely why they’ve wrapped the area where concrete is to be poured, to let it set properly.

What’s weird about being near the bridge when it’s closed is that it’s eerily quiet in the absence of traffic. The only sound is the constant cooing of all those darn pigeons. That in itself is kinda spooky…what if they decide to revolt?

While they’re at it…shouldn’t they take a look at some of this stuff? I mean, if the rest of the undercarriage of this bridge has broken rebar and crumbling concrete…do we really want to reopen it? That’s kinda scary.

We’ve all had a taste of what life will be like while the bridge’s replacement is built…it’s not fun. Hopefully, once the construction on a new bridge gets underway, the process of building a new one will go quickly.

Some people think this bridge is just fine the way it is, and should simply be properly maintained. Others want it scrapped in favor of a new and better one. Then there’s the shock and awe brought about by its deterioration. And of course those who want it preserved as a historical item.

Personally, I think the historic appeal of this bridge died when they decided to put a concrete deck on the famous “singing bridge.” Now that it appears to be rusting and crumbling away, let’s replace it. But let’s do so responsibly. And I sure hope the next design lasts as long as this one has!

Leave a Reply

Your email address will not be published. Required fields are marked *